CenterPoint Energy Substation Maintenance

Sulllivan Substation 0005  Substation

Location: Texas

Description: This project consisted of both electrical and structural work including line arrestor replacement, installation of circuit breakers, new transformers (and removal of existing) and assembly of t-structures.  Work also included pier and structural pad foundations and duct banks.  Relay and SCADA work included installation of a station service cabint, control panel (and removal of existing), indoor overhead tray system and panel wiring.

Completion Date: December 2012

Work Performed By: The L.E. Myers Co. (L.E. Myers), a subsidiary of MYR Group

Client: CenterPoint Energy