Limestone to Gibbons Creek Transmission Line Transmission
Limestone to Gibbons Creek Transmission Line |
|
---|---|
Client | Cross Texas Transmission, LLC (CTT) |
Completion Date | April 2018 |
Location | Texas |
The Limestone to Gibbons Creek 345kV Transmission Line connected two major substations – Limestone and Gibbons Creek – in southeast Texas with 68 miles of 345kV double-circuit transmission line. As part of the 345kV Houston Import Capacity Project, this work was designed to increase reliability, relieve congestion, lower electricity costs, and improve the utilities’ capabilities to respond to grid emergencies.
L.E. Myers provided construction management, material procurement, and construction services, including right-of-way clearing, environmental controls, foundation installation, structure assembly and erection, and conductor stringing.