Killdeer to Hampton 345/161kV Transmission Line Transmission

Client Confidential
Completion Date 2017
Location Iowa

L.E. Myers crews wrecked out 29 miles of wood, H-frame 161kV transmission line and replaced it with a 345/161kV double-circuit steel monopole transmission line that features structures set on drilled pier foundations and one static and optical ground wire (OPGW).